Aligning Levels in DroneDeploy for Accurate BIM Models

Have more questions? Submit a request

In DroneDeploy, properly aligning levels is critical to maintaining the accuracy and consistency of your Building Information Modeling (BIM) project. If the levels are not aligned correctly, it can impact the integrity of the entire model, leading to inaccuracies that affect decision-making and the project's outcome. This guide will explain the importance of aligning levels and the steps to ensure consistency throughout your BIM model.

Why Aligning Levels is Important

Consistent alignment across all levels is essential for the accuracy of a BIM model. If the levels are misaligned, discrepancies will occur when projecting data, ultimately affecting the reliability of the model.

  • Accurate Data Representation: Correct alignment ensures the overlay data aligns seamlessly across all layers.
  • Ensures Consistency Across Levels: Misalignment can cause issues in the final BIM model, where one layer may not match the others, disrupting the integrity of the entire project.
  • Align Once for the Entire Project: Since we only align the BIM model once for the entire project, it is essential to ensure that each layer (or level) is aligned correctly from the start.

Steps to Align Levels in DroneDeploy BIM Models

  1. Adding the First Exterior Layer

    • You can open your project in DroneDeploy and navigate to the add overlay section.
    • Then, add your first exterior layer (this will be the base level of your model).
    • Use the available tools to draw or import the exterior layer's geometry, ensuring it is positioned correctly within the project boundaries. Make sure your alignment to the original area is set and accurate.
  2. Adding Subsequent Levels

    • Once the first exterior layer is in place, could you add the subsequent levels of your model?
    • You must import the layer's geometry for each new level, just like the first exterior layer.
    • Even if it's on a different level on the interior project, please align it to the original base map on the exterior.
  3. Aligning the Levels

    • After adding each new level, use the alignment tool to ensure it is positioned correctly relative to the previous layer.
    • Align each level to the base exterior layer to maintain consistency. This alignment is critical because it ensures all levels align correctly in the final BIM model.
  4. Snapping Layers Together

    • After aligning each level, snap the geometry to the next layer. This process ensures that each subsequent level is perfectly aligned to the one below it.
    • Use the snapping tool to connect the points between the layers and ensure the geometry seamlessly transitions from one level to the next.
  5. Final Check

    • Once all levels are added and snapped together, could you double-check that all layers are aligned in a straight line and that there are no discrepancies in the positioning?
    • This final check will ensure that your BIM alignment will work properly across the entire project.

Key Notes:

  • Only align the BIM model once to the entire project. This means the overlays must be aligned similarly to ensure the BIM model functions correctly across different levels.
  • Consistent alignment is crucial for the model's accuracy and ensuring the layers fit together correctly when viewed in the final model.

 

By following these steps, you can ensure that each level of your BIM model is aligned consistently. This will maintain the model's integrity and accuracy, ensuring that the final project is as precise as possible.

Don't hesitate to contact our support team for more information or any issues.